
Cured-In-Place-Pipelining Demonstration Days July 18 – 19
Perma-Liner Industries, LLC. to Hold Live Cured-In-Place-Pipelining Demonstration Days and Educational Sessions Open House will be held in Anaheim, Cali. on July 18 – 19

Perma-Liner Industries, LLC. to Hold Live Cured-In-Place-Pipelining Demonstration Days and Educational Sessions Open House will be held in Anaheim, Cali. on July 18 – 19

Perma-Liner™ Industries, LLC. (“Perma-Liner”), the leading manufacturer and supplier of trenchless pipeline rehabilitation equipment and materials in North America, is introducing a new high-performance epoxy

There are many variables threatening America’s water from pollution issues and aging infrastructure to raising costs and droughts and rainfall patterns as the climate changes.

Undoubtedly, you are still enjoying the many highlights that this time of year brings, but as the glory days of summer begin to wane, no

San Diego is part of a semi-arid coastal desert environment that averages only 9.3 inches of rainfall annually. Less than one-fourth of San Diego’s water

With more than 2,500 miles of roads, nearly 5,000 miles of sidewalks, and a maze of underground pipes and sewer lines, San Diego focal point